4th day

a lot of safety and prevention need to be considered in here. As we know prevention is better than cure, so even we think that's small matter it's become problem to the employers when its bring accident.

week our company will be visited by "juruaudit"., they job are to make sure all the safety in the distribution site follow the rules and regulation that are specify by them. so my SIR order us to make sure all the things that comment by them b4 this are done by us .

about 10.30 am, we have visited by speacialist from Sandakan, the purpose he came to set up the relay in 33kv room. actually there have a faulty over there.

at the afternoon, i follow matsarizal to GT2 control room, i want to check up wat specific push button i need to order, i'm not sure about the current ratings, so i go down to check up the voltage, then i found it's 3 phase so it' 415 v. nad then i calculate the current, it's rating below 15 ohm, so i give him suggestion to take

LED Elements – front mounted
RED AND GREEN

85 – 264 V AC,
50/60 Hz
5 – 15 mA

5th day

we do the houskeeping and fixed the lamp at 11kv room. i went to oil pump station and do some interview, he said that they will pump the oil from the lorry about 14 times everyday, and it's around 100, 000 littres, wow!!!! but it's depand by the engines.

when clean up the room in 11 and 33kv room, we need to oen the big door so that we got fresh air, otherwise we will be fainted inside there.

No comments: