Industrial Training
Followers
Blog Archive
▼
2010
(18)
►
July
(1)
▼
June
(3)
metering (week 10)
STILL WAITING FROM LDC (LOAD DESPATCH CENTRE ) to ...
OPC & LPC(week 9)
►
May
(3)
►
April
(11)
About Me
Riszawanah Harris
future EXCELLENT ENGINEER
View my complete profile
Monday, June 28, 2010
metering (week 10)
fixed failure meter at the consumers in the Tawau town
doing cut off in the rural are
wiring connection to giv supply from the service line
Wednesday, June 23, 2010
STILL WAITING FROM LDC (LOAD DESPATCH CENTRE )
to figure out which card damaged in DE3B, all of them have 11 cards,,, as permanent we used the cards from DE4B which is can't be used for a while
Thursday, June 3, 2010
OPC & LPC(week 9)
today i went to distribution department.
wat is opc????
ordinary power consumer such as houses and shops,
wat is lpc???
large power consumer such as shopping complex ang factory's
my job to take meter reading on the meter panel which is this should be done every month
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)