Saturday, July 3, 2010
job the whole week 11
maintenence substation, follow standby team
calculate percentage transformer that being used so far, by reading the current using clam on meter on feeder pillar in rombengan substation
Monday, June 28, 2010
metering (week 10)
fixed failure meter at the consumers in the Tawau town
doing cut off in the rural are
wiring connection to giv supply from the service line
Wednesday, June 23, 2010
STILL WAITING FROM LDC (LOAD DESPATCH CENTRE )
to figure out which card damaged in DE3B, all of them have 11 cards,,, as permanent we used the cards from DE4B which is can't be used for a while
Thursday, June 3, 2010
OPC & LPC(week 9)
today i went to distribution department.
wat is opc????
ordinary power consumer such as houses and shops,
wat is lpc???
large power consumer such as shopping complex ang factory's
my job to take meter reading on the meter panel which is this should be done every month
Monday, May 24, 2010
WHOLE WEKK 7
CLEAN ENGINE USING ROCHEM
SPECIAL CLEANER FOR ENGINE TO TAKE OF ALL DIRTINIES
Friday, May 14, 2010
the whole week 6
maintenence gt1
pick up vibration detection failed
change with the new
Wednesday, May 5, 2010
maintenence (the whole week 5)
maaintenence interbus transformer
fill in the insulation oil